Workers on the Green River Bridge direct the concrete over the forms. The bridge has been closed to traffic since Sept. 30 and traffic has been detoured. Those working on the east side of the bridge have had to either use the foot bridge which has remained open or they have to leave town and get back on I-70 and go around to the east exit and come back into town. See story on page 3A.
[dfads params='groups=4969&limit=1&orderby=random']
[dfads params='groups=1745&limit=1&orderby=random']